Huawei Router Q6 Power Version Gigabit Network Port Wi-Fi6+ through the Wall Wireless Large Apartment Lingxiao Sub-Mother Routing
5,115.12تومان
- Stock: In Stock
- Brand: Smart Device Digital Store
- Model: t680199393403
Available Options
Create unlimited custom product blocks and display them in accordions or tabs or open blocks. Each block can be assigned to all products at once or specific products according to advanced criteria.
Create unlimited custom product blocks and display them in accordions or tabs or open blocks. Each block can be assigned to all products at once or specific products according to advanced criteria.






















| Product Specifications | |
| Brand | Huawei |
| Model | Huawei Router Q6 |
| Time to Market | 2023-07-01 |
| After-Sales Service | Nationwide Warranty,Store Warranty |
| Networking Method | Wireless Networking |
| Wifi Protocol | Wi-Fi6+ |
| Wireless Transmission Rate | 3000Mbps |
| Applicable Objects | Large Apartment,Medium-Sized Apartment |
| Warranty Period | 12 Months |
| Network Type | 2.4G |
| Condition | Brand New |
| Number of Lan Ports | 2 |
| Number of USB Interfaces | Not Supported |
| App Control | Support App Control |
| Dual Broadband Access | Does Not Support Dual Broadband Access |
| Is It Wireless? | Yes |
| Is It Detachable? | Not Detachable |
| Total Carrying Capacity | 255 Units |
| Wireless Network Support Frequency | 2.4G&5G |
| Does It Support Wps? | No |
| Whether There Is a Built-In Firewall | Yes |
| Color Classification | Huawei Kirin Q6 Power Edition [One-To-One] Supports All Broadband Networks,Huawei Kirin Q6 Power Edition [One-To-Two] Supports All Broadband Networks,Huawei Kirin Q6 Power Edition [1-to-3] Supports All Broadband Networks,Huawei Kirin Q6 Power Edition [One-To-One] Supports All Broadband Networks,Huawei Kirin Q6 Power Edition [One-To-Two] Supports All Broadband Networks,Huawei Kirin Q6 Power Edition [1-to-3] Supports All Broadband Networks,Huawei Kirin Q6 Power Edition [One-To-One] Supports All Broadband Networks,Huawei Kirin Q6 Power Edition [One-To-Two] Supports All Broadband Networks,Huawei Kirin Q6 Power Edition [1-to-3] Supports All Broadband Networks,Huawei Lingxiao Q6 Power Edition [One to One] [Official Version],Huawei Lingxiao Q6 Power Edition [One to Two] [Official Version],Huawei Lingxiao Q6 Power Edition [One to Three] [Official Version],Huawei Lingxiao Q6 Power Edition [One to Four] [Official Version],Special Offer Only Unpacked! Huawei Lingxiao Q6 Power Edition [One to One],A Separate Sub-Router Can Be Added at Any Time and Needs to Be Used with the Matchingq6 Mother Router,All Are Genuine Huawei Products. if They Are Fake, You Will Be Fined Ten |