Your Cart

Yongsheng Transparent Tape Large Roll 6cm Wide Tape Express Packaging Tape Sealing High Temperature Resistant Sealing Tape Tape

Yongsheng Transparent Tape Large Roll 6cm Wide Tape Express Packaging Tape Sealing High Temperature Resistant Sealing Tape Tape
Yongsheng Transparent Tape Large Roll 6cm Wide Tape Express Packaging Tape Sealing High Temperature Resistant Sealing Tape Tape
Yongsheng Transparent Tape Large Roll 6cm Wide Tape Express Packaging Tape Sealing High Temperature Resistant Sealing Tape Tape
Yongsheng Transparent Tape Large Roll 6cm Wide Tape Express Packaging Tape Sealing High Temperature Resistant Sealing Tape Tape
Yongsheng Transparent Tape Large Roll 6cm Wide Tape Express Packaging Tape Sealing High Temperature Resistant Sealing Tape Tape
Yongsheng Transparent Tape Large Roll 6cm Wide Tape Express Packaging Tape Sealing High Temperature Resistant Sealing Tape Tape
Yongsheng Transparent Tape Large Roll 6cm Wide Tape Express Packaging Tape Sealing High Temperature Resistant Sealing Tape Tape
Yongsheng Transparent Tape Large Roll 6cm Wide Tape Express Packaging Tape Sealing High Temperature Resistant Sealing Tape Tape
Yongsheng Transparent Tape Large Roll 6cm Wide Tape Express Packaging Tape Sealing High Temperature Resistant Sealing Tape Tape
Yongsheng Transparent Tape Large Roll 6cm Wide Tape Express Packaging Tape Sealing High Temperature Resistant Sealing Tape Tape
Yongsheng Transparent Tape Large Roll 6cm Wide Tape Express Packaging Tape Sealing High Temperature Resistant Sealing Tape Tape
67.68تومان
  • Stock: In Stock
  • Model: l742486822101
  • Location: Jinhua City, Zhejiang Province

Available Options

This product has a minimum quantity of 5
Create unlimited custom product blocks and display them in accordions or tabs or open blocks. Each block can be assigned to all products at once or specific products according to advanced criteria.
Create unlimited custom product blocks and display them in accordions or tabs or open blocks. Each block can be assigned to all products at once or specific products according to advanced criteria.
Product Specifications
Origin Yiwu
Brand Yongsheng
Film thickness 52u
Width 42-60
Length 110-260
Product application E-commerce express packaging and sealing, cartons, electrical appliances, clothing, fruits in various industries
Long-term temperature resistance Excellent
Short-term temperature resistance Excellent
Purely thick 1-3
Base material Bopp film
Construction precautions Fire protection
Scope of application Packaging and sealing, express packaging and sealing for various e-commerce industries, cartons, electrical appliances, clothing, fruits
Features Other
Item number Single ys001
Tear-off method Need to use a knife
Temperature resistance range Normal temperature
Thickness Contains paper tube 2-6
Glue system Butyl pressure sensitive adhesive
Viscosity High viscosity
Temperature resistance Excellent
Static shear time 1s
Main downstream platforms Ebay
Main sales area Africa
Whether to exclusively supply goods for cross-border export Is
Specification Width 48*thickness 25*160 [full box of 36 rolls],Width 42*thickness 7*30 [full box of 84 rolls] (including paper tube thickness 7mm!),Width 48*thickness 20*110 [full box of 48 rolls],Width 45*thickness 30*200 [36 rolls in a box],Width 42*thickness 25*160 [full box of 42 rolls],Width 42*thickness 30*200 [full box of 42 rolls],*width 48*thickness 32*260 [36 rolls in a box],Width 45*thickness 35*300 [24 rolls in a box],Width 60*thickness 25*160 [30 rolls in a box],Width 60*thickness 20*110 [full box of 40 rolls],Width 48*thickness 30*200 [36 rolls in a box],Width 45*thickness 20*110 [full box of 48 rolls],Width 45*thickness 25*160 [36 rolls in a box],Width 60*thickness 30*200 [30 rolls in a box],Width 42*thickness 10*50 [84 rolls in a box],Width 42*thickness 20*110 [56 rolls in a box],Width 55*thickness 30*200 [36 rolls in a box],Width 55*thickness 20*110 [full box of 48 rolls],Width 55*thickness 25*160 [36 rolls in a box],Width 43.5*thickness 20*110 [full box of 48 rolls],Width 43.5*thickness 30*200 [36 rolls in a box],Width 43.5*thickness 25*160 [36 rolls in a box]
Color Beige,Transparent white,Transparent yellow,Taobao blue,Taobao black gold,Taobao red
Specifications and models Transparent yellow; width 42*thickness 7*30 [full box of 84 rolls] (including paper tube thickness 7mm!),Transparent yellow; width 42*thickness 10*50 [full box of 84 rolls],Transparent yellow; width 42*thickness 20*110 [full box of 56 rolls],Transparent yellow; width 42*thickness 25*160 [full box of 42 rolls],Transparent yellow; width 42*thickness 30*200 [full box of 42 rolls],Transparent yellow; width 45*thickness 20*110 [full box of 48 rolls],Transparent yellow; width 45*thickness 25*160 [36 rolls in a box],Transparent yellow; width 45*thickness 30*200 [36 rolls in a box],Transparent yellow; width 45*thickness 35*300 [full box of 24 rolls],Transparent yellow; width 48*thickness 20*110 [full box of 48 rolls],Transparent yellow; width 48*thickness 25*160 [full box of 36 rolls],Transparent yellow; width 48*thickness 30*200 [36 rolls in a box],Transparent yellow; width 48*thickness 32*260 [full box of 36 rolls],Transparent yellow; width 55*thickness 20*110 [full box of 48 rolls],Transparent yellow; width 55*thickness 25*160 [36 rolls in a box],Transparent yellow; width 55*thickness 30*200 [36 rolls in a box],Transparent yellow; width 60*thickness 20*110 [full box of 40 rolls],Transparent yellow; width 60*thickness 25*160 [30 rolls in a box],Transparent yellow; width 60*thickness 30*200 [30 rolls in a box],Transparent white; width 42*thickness 20*110 [full box of 56 rolls],Transparent white; width 42*thickness 25*160 [full box of 42 rolls],Transparent white; width 42*thickness 30*200 [full box of 42 rolls],Transparent white; width 45*thickness 20*110 [full box of 48 rolls],Transparent white; width 45*thickness 25*160 [36 rolls in a box],Transparent white; width 45*thickness 30*200 [36 rolls in a box],Transparent white; width 48*thickness 20*110 [full box of 48 rolls],Transparent white; width 48*thickness 25*160 [full box of 36 rolls],Transparent white; width 48*thickness 30*200 [full box of 36 rolls],Transparent white; width 55*thickness 20*110 [full box of 48 rolls],Transparent white; width 55*thickness 25*160 [36 rolls in a box],Transparent white; width 55*thickness 30*200 [36 rolls in a box],Transparent white; width 60*thickness 20*110 [full box of 40 rolls],Transparent white; width 60*thickness 25*160 [30 rolls in a box],Transparent white; width 60*thickness 30*200 [30 rolls in a box],Beige; width 42*thickness 20*110 [full box of 56 rolls],Beige; width 42*thickness 25*160 [full box of 42 rolls],Beige; width 42*thickness 30*200 [full box of 42 rolls],Beige; width 45*thickness 20*110 [full box of 48 rolls],Beige; width 45*thickness 25*160 [full box of 36 rolls],Beige; width 45*thickness 30*200 [36 rolls in a box],Beige; width 48*thickness 20*110 [full box of 48 rolls],Beige; width 48*thickness 25*160 [full box of 36 rolls],Beige; width 48*thickness 30*200 [36 rolls in a box],Beige; width 55*thickness 20*110 [full box of 48 rolls],Beige; width 55*thickness 25*160 [36 rolls in a box],Beige; width 55*thickness 30*200 [full box of 36 rolls],Beige; width 60*thickness 20*110 [full box of 40 rolls],Beige; width 60*thickness 25*160 [30 rolls in a box],Beige; width 60*thickness 30*200 [30 rolls in a box],Taobao blue; width 42*thickness 20*110 [full box of 56 rolls],Taobao red; width 42*thickness 25*160 [full box of 42 rolls]
Backing material Pressure sensitive adhesive
Color Transparent yellow, transparent white, beige
Tape classification Packaging tape

Write a review

Please login or register to review

More ways to get help

Contact us on [email protected]